Relocation of one Tissue mill from Portugal to Africa, a green field site. The scope of work contains:
- Mill mapping at existing site in Portugal including documentation and scanning
- Evaluation of what can be reused at existing plant
- Process calculation and capacity evaluation for complete Tissue plant
- Assisting with inquiries and purchase
- Layouts for Tissue machine and DIP line at new site
- Basic engineering, for increased capacity target, 100 % increased capacity
- Civil guide drawings, civil construction drawings
- Detailed engineering
- BOP (Balance of plant)
- Piping, steel and tanks
- Electrification and instrumentation
- Technical co-ordinators.