Sale of one second-hand Fluting machine from Germany including upgrading of capacity from 200 to 400 ton/24h. Change of quality to white top liner, liner, fluting and test liner. The upgrade of PM was performed by Metso Como Italy. Our part of the project covered dismantling, mill mapping, machine packing and shipment of PM in Germany to Algeria. PROMT also where responsible for all engineering outside PM as; mill layout, plant layout, civil guide and detailed design of piping, electrical instrument, process and pipe design performed in PDMS. We also upgraded the OCC system to one bottom ply line 360 ton/24h and one top ply line 120 ton/24h. We supplied new equipment such as tanks, pumps, agitators, screens, hand valves and field instruments at a value of 6 M€. Total project turnover about 45 M€. We were also responsible for process descriptions, FAT tests and check-out.